Reznor CAUA Sizes 350 and 400 Option - Installation - Inlet Air Base User Manual
Installation instructions, Dimensions, Description and application
Form I-CAUA-IB, P/N176515R2 Page 1
42-1/4 (1073)
2-21/32
(67)
2-21/32
(67)
50-1/8 (1273)
20-5/8
(524)
20-5/8
(524)
36-1/8
(918)
5 (127)
5 (127)
17-7/8
(454)
52-15/16
(1345)
135-23/32
(3447)
36-1/2
(927)
82-25/32
(2103)
41-7/8 (1064)
49-7/8 (1267)
Centerline of adjustable legs
Centerline of adjustable legs
Discharge
Airflow
Return
Airflow
Side View
CAUA 350 or 400
with Optional Inlet
Air Base and
Optional Discharge
Plenum
Rear View
CAUA 350 or 400
with Optional Inlet
Air Base and
Optional Discharge
Plenum
Option CD60,
CD61, or CD62
Discharge Plenum
Model CAUA
Size 350 or 400
Upflow Heater
Option AVA2,
Inlet Air
Mounting Base
Dimensions
Form I-CAUA-IB (Version A)
Obsoletes I-CAUA-IB
Installation Instructions
Applies to: Inlet Air Mounting Base,
Option AVA2, for Model CAUA
Sizes 350 and 400
Description and
Application
The optional mounting base is designed to support a Model CAUA 350 or 400 heater
while providing an inlet for return air. The mounting base is designed to be used with
an optional discharge plenum creating a "packaged stand-alone" heating or heating /
cooling upflow system which can be used in an air turnover application. However, if
the application requires it, the mounting base may also be used with discharge duct-
work. The mounting base has guarded openings on all four sides and is available with
optional 1" flat disposable, 1" permanent aluminum, or 1" pleated disposable filters. If
optional filters are ordered, they are installed at the factory.
Location and
Installation
The openings in the base allow return air to be circulated into the system. The base
is designed to be used in a fairly open area that does not have obstructions to airflow.
The base must have three or four sides open, which means it can be placed next to
a wall but not in a corner. Select a location where airflow is not obstructed on at least
three sides. Impeding the airflow at the inlet (or discharge), either permanently or tem-
porarily, will reduce the effectiveness of this system.
After the base is in the selected location, check it with a level. Adjust the legs until the
base is level. When the base is level, place the heater on top.
Follow the instructions in the heater installation manual to complete the installation.
www.ReznorHVAC.com; (800) 695-1901
©2014 Reznor, LLC. All rights reserved.
Trademark Note: Reznor
®
is registered in at least the United States.
0514 Form I-CAUA-IB (Version A.1)