GB - 8

38VYX110/38VYX130

• When there is a possibility of freezing of drain at the cold

district or a snowfall area, be careful for drainage ability of
drain.
The drainage ability increases when a knockout hole on the
base plate is opened. (Open the knockout hole to outside
using a screwdriver, etc.)

• In case of draining through the drain hose, attach the following

drain nipple and the waterproof rubber cap, and use the drain
hose (Inner diam.: 16mm) sold on the market.
And also seal the screws securely with silicone material, etc. so
that water does not drop down. Some conditions may cause
dewing or dripping of water.

Drain nipple

Installation

Knockout hole

Waterproof rubber cap

Drain nipple

A Open

A

Waterproof rubber cap

Table VI: Optional Installation Parts

(local procure)

CAUTION:
IMPORTANT FOR POINTS BELOW FOR PIPING WORK

1. Keep dust and moisture away from inside the connecting

pipes.

2. Tightly connect the connection between pipes and the unit.
3. Evacuate the air in the connecting pipes using VACUUM

PUMP.

4. Check gas leak at connected points.

Parts name

Q’ty

Refrigerant piping

A

Liquid side: ø 6,35 mm o ø 9,52 mm

Each one

Gas side: ø 12,7 mm o ø 15,9 mm

B

Pipe insulating material

1

(polyethylene foam, 6 mm thick)

C

Putty, PVC tapes

Each one

Table VII: Piping connection

Capacity rank

Liquid piping

Gas piping

Outer diameter

Thickness

Outer diameter

Thickness

38 VYX 110-130

ш 9,52

0,8

ш 15,9

1,0

- This air conditioner can be installed up to the connecting pipe length and height difference in the following table.

Table VIII: Air Purge

Capacity rank

Max. connecting

Height difference (m)

Hexagonal

pipe length (m)

Outdoor unit higher than indoor unit Outdoor unit lower than indoor unit

w

rench size

38 VYX 110-130

50

30

15

4 mm

This manual is related to the following products: