beautypg.com

3 hydraulic plumbing – NORAC UC5-BC-WK01 User Manual

Page 30

background image



27

10.3 Hydraulic Plumbing

From this point on in the installation the booms will be inoperative until the

hydraulics are fully installed.

1. After the NORAC valve is mounted, the hydraulic hoses and fittings can be plumbed. The

plumbing for the hydraulic circuit is shown schematically in Figure 3.

2. Connect the 90º ends of hoses H02 to the pressure (P) and tank (T) ports on the NORAC

valve block.

3. Connect the 6MJ 6FJX90 fittings (F04) to the straight ends of hoses H02.

4. Mount the 6MJ 6MJ bulkhead adapters (F10) as shown in Figure 32.

5. Connect fittings F04 to one side of the mounted F10 fittings.

6. Connect hoses H01 to F10 and route to the sprayer valve block.

Figure 32: Bulkhead Adapter (F10) Mounting Location

7. Tee hoses H01 into the pressure and tank ports on the sprayer valve block using the 8FJ

6MJ fittings (F08) and the 8FJXR 8MJT tees (F06).

8. Insert the 6FJXR 6MJT tee fittings (F05) between the existing “raise” lines and the tilt

cylinder.

9. Connect the straight ends of hoses H04 to the free end of the F05 tees and route to the

NORAC valve block.

10. Connect the 90º ends of hoses H04 to the “B” ports of the NORAC valve block. The

“raise” lines must be connected to the “B” ports of the NORAC valve block.