3 input module – NORAC UC5-BC-FT02A User Manual
Page 19
16
7.3
Input Module
1. Install the input module (E03) on the boom near the Fast valve block. Secure it to the
boom using cable ties or optional brackets.
2. Connect the free end of the CANbus cable (C02) from the valve module to the input
module.
3. Insert the 12 pin plug (P02) into the OEM 3 connector on the end of the input module.
Figure 14: Input Module Connections
4. Connect the 12 pin connector on the tilt interface cable (C20) to the Thru 2 connector on
the side of the input module. Connect “Left Up” to “Left” on the Fast valve block and
“Right Up” to “Right”. Connect the unused male and female connectors on “Left Down” to
each other and connect the unused male and female connectors on “Right Down” to each
other.
5. Connect the 12 pin connector on the main lift interface cable (C21) to the Thru 1
connector on the side of the input module. Insert the “Aux 2” tee between the Fast
directional cartridge and the existing cable. Insert the “Main Up” tee between the Fast
“Main” function cartridge and the existing cable. Connect the unused male and female
connectors on “Main Down” to each other.
6. If the sprayer has a bypass valve, insert the 2-pin tee connector marked “AUX 1” into the
bypass valve connection. If the sprayer does not have a bypass valve, connect the plug and
receptacle “Aux 1” connectors together.