4 hydraulic plumbing – NORAC UC5-BC-RG12 User Manual
Page 30
27
8.4 Hydraulic Plumbing
From this point on in the installation the booms will be inoperative until the
hydraulics are fully installed.
1. After the NORAC valve is mounted, the hydraulic hoses and fittings can be plumbed. The
plumbing for the hydraulic circuit is shown schematically in Figure 3.
2. Disconnect the tank line at the Rogator valve block and insert the 8FORXR 8MORT tee
(F03).
3. Connect hose H05 to the tee (F03) and route to the NORAC valve block.
4. Disconnect the pressure line at the Rogator valve block and insert the 6FORXR 6MORT
tee (F02).
5. Connect hose H04 to the tee (F02) and route to the NORAC valve block.
Figure 27: Rogator Pressure and Tank Plumbing
6. Connect hose H04 to the pressure port and hose H05 to the tank port on the NORAC
valve block.
7. Disconnect and remove the existing left and right raise lines.
8. Insert the 12FORX 6MOR fitting (F05) into the left and right raise ports on the Rogator
valve block.
9. Connect two H04 hoses to fittings F05 and route the hoses to the NORAC valve block.