beautypg.com

4 hydraulic plumbing – NORAC UC5-BC-RG11 User Manual

Page 30

background image



27

9.4 Hydraulic Plumbing

From this point on in the installation the booms will be inoperative until the

hydraulics are fully installed.

1. After the NORAC valve is mounted, the hydraulic hoses and fittings can be plumbed. The

plumbing for the hydraulic circuit is shown schematically in Figure 3.

2. Disconnect the tank line at the Rogator valve block and insert the 8FORXR 8MORT tee

(F03).

3. Connect hose H05 to the tee and route to the NORAC valve block.

4. Disconnect the pressure line at the Rogator valve block and insert the 6FORXR 6MORT

tee (F02).

5. Connect hose H04 to the tee and route to the NORAC valve block.

Figure 29: Rogator Pressure and Tank Plumbing

6. Connect hose H04 to the pressure port and hose H05 to the tank port on the NORAC

valve block.

7. Disconnect and remove the existing left and right raise lines.