NORAC UC5-BC-RG06 User Manual
Page 35
32
10.5 Hydraulic Plumbing For RG06 (Flat Faced O-Ring Fittings)
From this point on in the installation the booms will be inoperative until the
hydraulics are fully installed.
1. After the NORAC valve is mounted, the hydraulic hoses and fittings can be plumbed. The
plumbing for the hydraulic circuit is shown schematically in Figure 3.
2. Disconnect the tank line at the Rogator valve block and insert the 8FORXR 8MORT tee
(F03) or insert the 12FORXR 12MORT tee (F12) and 12FORX 8MOR adapter (F13).
3. Connect hose H05 to the tee and route to the NORAC valve block.
4. Disconnect the pressure line at the Rogator valve block and insert the 6FORXR 6MORT
tee (F02) or insert the 8FORXR 8MORT tee (F03) and 10MB 8MOR adapter (F11) and
8FORX 6MOR adapter (F14).
5. Connect hose H04 to the tee and route to the NORAC valve block.
Figure 30: Rogator Pressure and Tank Plumbing
6. Connect hose H04 to the pressure port and hose H05 to the tank port on the NORAC
valve block.
7. Disconnect and remove the existing left and right raise lines.
8. Insert the 12FORX 6MOR fitting (F05) to the left and right raise ports on the Rogator valve
block.
9. Connect each of the two H04 hoses to fittings F05 and route the hoses to the NORAC
valve block.