4 hydraulic plumbing for rg04 (jic fittings) – NORAC UC5-BC-RG06 User Manual
Page 33
30
10.4 Hydraulic Plumbing for RG04 (JIC Fittings)
From this point on in the installation the booms will be inoperative until the
hydraulics are fully installed.
1. After the NORAC valve is mounted, the hydraulic hoses and fittings can be plumbed. The
plumbing for the hydraulic circuit is shown schematically in Figure 3.
2. Disconnect the tank line at the Rogator valve block and insert the 8FJXR 8MJT tee (F03) or
insert the 12FJXR 12MJT tee (F12) and 12FJ 8MJ adapter (F13).
3. Connect hose H05 to the tee and route to the NORAC valve block.
4. Disconnect the pressure line at the Rogator valve block and insert the 6FJXR 6MJT tee
(F02) or insert the 8FJXR 8MJT tee (F03) and 10MB 8MJ adapter (F11) and 8FJ 6MJ adapter
(F14).
5. Connect hose H04 to the tee and route to the NORAC valve block.
Figure 29: Rogator Pressure and Tank Plumbing
6. Connect hose H04 to the pressure port and hose H05 to the tank port on the NORAC
valve block.
7. Disconnect and remove the existing left and right raise lines.
8. Insert the 12FJ 6MJ fitting (F05) to the left and right raise ports on the Rogator valve block.
9. Connect each of the two H04 hoses to fittings F05 and route the hoses to the NORAC
valve block.