beautypg.com

NORAC UC5-BC-RG06 User Manual

Page 34

background image



31

10. Connect each of the two H04 hoses to the corresponding left and right “B” port on the

NORAC valve block. Insert the 6FJXR 6MJT tee (F02) between the hoses and the valve
block.

11. The left raise line (H03) must now be connected to the left tee on the “B” port and the

right raise line (H02) must be connected to the right tee. Route the hoses to the tilt
cylinders. H03 is longer than H02 since the NORAC valve block is normally located on the
right side of the sprayer.

12. Connect H02 and H03 to the cylinders using the 12FJ 6MJ fittings (F05).

13. The existing lower lines do not need to be modified. Leave these lines connected to the

Rogator valve block

This manual is related to the following products: