beautypg.com

11 software setup, 1 jd tilt sensor calibration instructions – NORAC UC5-BC-JD12 User Manual

Page 34

background image



31

11 Software Setup

1. Start up the sprayer and test the sprayer’s functionality. The display terminal does not need

to be powered on for the original boom function switches to operate. Unfold the booms
and raise/lower each boom and the main section.

Confirm that the cabling and hoses are agreeable to the entire range of motion.

2. If any functions do not work, review the hydraulic and electrical portions of this manual to

check for proper installation.

3. Turn on the power for the display terminal using the switch on the side.

4. The procedure for the installation of the UC5 Spray Height Control system is now

complete. Begin the AUTOMATIC SYSTEM SETUP procedure as described in the UC5

Spray Height Control Operator’s Manual.

5. After the installation has been performed the following procedures (Section 11.1 and

Section 11.2) should be performed to recalibrate the JD tilt functions.

11.1 JD Tilt Sensor Calibration Instructions

1. Ensure the NORAC system is plugged in and powered up.

Figure 30: Calibration Screen (Tilt Sensor Selection)

2. Select the Calibration softkey (A) to view the setup menu.