16. Attach hose H01 to the F06 fitting on the “B” port on the 3

rd

station of the block. Route

the free end of the hose to the John Deere valve block. Tee in H01 to the existing main lift
line on the John Deere valve block, using a 6FORXR-6MORT tee (F05) and a 6MOR-
6FORX90 fitting (F06).

17. Connect hose H03 to the “S” port of the NORAC block.

18. Insert a 6FORXR-6MORT tee (F05) into the existing load sense connection.

19. Install a 6MOR-6FORX90 fitting (F06) onto the tee (F05).

20. Install the 4MOR-6FORX fitting (F10) onto the F06 fitting.

21. Connect hose H03 to the F10 fitting.

Figure 28: Pressure and Tank Lines; Main Lift Tee

(as viewed from the leading side of the boom center)

Pressure

Line

Tank Line

Main Lift

Tee