NORAC UC4+BC+WR2 User Manual
Page 24
21
Figure 24: Cable Configurations: C01, C02, C02B, C03 and C04,
11. Connect the 6-pin Tower on the UC4 Valve
Cable (C03) to the 6-pin Shroud on C04 at
the rear of the sprayer (Figure 24).
12. The connectors on the valve cable (C03)
are marked RIGHT UP, LEFT UP,
RIGHT DOWN and LEFT DOWN.
Cables labeled with UP go on the same side
as the hydraulic hoses.
Figure 25: Valve Cable Connections
13. Connect the CAN Node cable (C02B) to
the 4-pin AMP plug on C11 (Figure 24).
14. Route the CAN Node cable (C02B) to the
roll sensors. Follow existing cables and/or
hydraulic lines.
15. Connect 4-pin AMP connectors on C02B to
the sensors.
16. Connect the sensor branch cable (C02) to
the 4-pin AMP plug on C02B.
17. Route the sensor branch cable (C02) to the
wing and main sensors and connect to the
sensors. Follow existing cables and/or
hydraulic lines along the boom.
18. Cable-tie the installed cables every 12
inches.
IMPORTANT:
Provide enough slack in all cables to
account for the movement of the main
section, parallel lift, and FOLDING boom
movement.