NORAC UC4+BC+RG7 User Manual
Page 26
23
Figure 26: Valve Cable Connections
16. Connect the CAN Node cable (C02B)
to the 4-pin AMP plug on C11 (Figure
27).
17. Route the CAN Node cable (C02B) to
the roll sensors which are installed in
Section 4.5. Follow existing cables
and/or hydraulic lines.
18. Connect the 4-pin AMP connectors to
the roll sensors.
19. Connect the sensor branch cable (C02)
to the 4-pin AMP plug on C02B
(Figure 27).
20. Route the sensor branch cable (C02) to
the wing and main sensors and connect
to the sensors. Follow existing cables
and/or hydraulic lines along the boom.
21. Cable-tie the installed cables every 12
inches.
Figure 27: Cable Configurations: C11,
C02 and C02B
IMPORTANT:
Provide enough slack in all cables to
account for the movement of the
main section, parallel lift, and
FOLDING boom movement.