beautypg.com

NORAC UC4+BC+RG4 User Manual

Page 27

background image

24

Figure 28: Access Plates

Configurations

Figure 29: Access Panel and Plates

Figure 30: Cable Configurations: C11, C12, C13 and C03

10. Route C11 to the rear of the sprayer,

in the vicinity of the valve block.

11. Connect S6 on the Interface cable

(C12) to T6A on C11 (Figure 30).

12. Route the free end of C12 to the

Rogator valve block.

13. Insert two sets of the Metri-Pack

connector tees (P2A-R2A and P2C-
R2C
) on C12 between the matching
solenoid valve connections: MAIN UP
and MAIN DOWN. For each tee, the
function is labeled on the branch wire.
Figure 31 illustrates where to tee in

the MAIN UP and MAIN DOWN
connections to the Rogator valve block.

The tee, P2B-R2B (labeled MAIN

UP), is not used for this
installation. Leave it unplugged.

14. Unplug the existing connectors on the

Rogator left and right boom control
valve connections. There are four
connectors to unplug: SV9 (RIGHT UP),

SV7 (RIGHT DOWN), SV10 (LEFT UP)
and SV8 (LEFT DOWN). Refer to
Figure 32
.

15. Connect four 2-pin Metri-Pack