8 completing the installation – NORAC UC4+BC+JD8 User Manual
Page 30
27
4.8 C
OMPLETING THE
I
NSTALLATION
1. Start up your sprayer and test the sprayer’s
functionality. The NORAC Control Panel
does not need to be powered up for the
original switches to function. Unfold the
booms and raise/lower each boom and main
section.
Confirm that the cabling/hoses are
agreeable to the entire range of
motion.
2. If any functions do not work, review the
hydraulic and electrical portions of this
manual to check for proper installation. If
you still have trouble, contact NORAC for
assistance.
3. Turn on the power for the UC4+ Control
Panel using the switch on the side of its
chassis.
4. Repeat the Boom Speed Test as described in
Section 4.2 Boom Speed Test with the
NORAC UC4+ Spray Height Control
system installed. Record the results for
comparison in Table 6.
5. The procedure for the installation of the
UC4+ Spray Height Control system is now
complete. Begin the AUTOMATIC SYSTEM
SETUP procedure as described in the UC4+
Spray Height Control system
Operator’s Manual (M01).