NORAC UC4+BC+JD8 User Manual
Page 29
26
12. Connect the six pin shroud (T6B) on cable
C17 to the mating tower on the valve
extension cable (C11).
13. Connect the three pin tower (T3) on cable
C17 to the mating tower on the valve
extension cable (C11).
Two connectors on C17 will remain
disconnected. These are used when
installing other UC4+ options.
14. Install the two 2-pin connectors on the end
of cable C17 to the 3
rd
station of the block
as per Figure 34.
The connector marked “Main Down”
goes on the same side of the block as
the hoses.
15. Connect the CAN Node cable (C02B) to
P4 on the valve extension cable (C11).
16. Route the CAN Node cable (C02B) to the
two roll sensors which are installed in
Section 4.5. Follow existing cables and/or
hydraulic lines.
17. Connect the 4-pin AMP connectors on
C02B to the roll sensors.
18. Connect the sensor branch cable (C02) to
the 4-pin AMP plug on C02B.
19. Route the sensor branch cable (C02) to the
wing and main sensors and connect to the
sensors. Follow existing cables and/or
hydraulic lines along the boom.
Route the main lift cable through the
main lift mounting bracket tube to
provide additional cable protection
20. Cable-tie the installed cables every 12
inches.
Figure 36: Cable Configurations: C11, C02
and C02B
IMPORTANT:
Provide enough slack in all cables to
account for the movement of the main
section, parallel lift, and FOLDING boom
movement.