Caution – LAARS U.H.E. - Installation Manual User Manual
Page 26
Figure 16. Typical Horizontal Power Vent System
Vertical Installation:
Vertical venting must be supported every 5 feet of vertical run and every 3 feet of horizontal run of vent pipe
length.
Stress levels in the pipe and fittings can be significantly increased by improper installation. If rigid pipe clamps
are used to hold the pipe in place, or if the pipe cannot move freely through a wall penetration, the pipe may be
directly stressed, or high thermal stresses may be formed when the pipe heats up and expands. Install accordingly
to minimize such stresses.
CAUTION
Failure to properly support the vent piping with hangers and clamps may result in damage to the water heater
or venting system.
26
See also other documents in the category LAARS Water boiler:
- LCH504T - Installation Manual (30 pages)
- Combi Heat TTW - Installation Manual (45 pages)
- Custom ASME Storage Tanks - Installation Manual (1 page)
- EBP 110 MBTU/h - Installation, Operation and Maintenance Instructions (40 pages)
- IGE-199R - Installation Manual (44 pages)
- IGE-199R-10(N,X) - Service Manual (60 pages)
- IGI-180R - Installation Manual (68 pages)
- IGI-180R-10(N,X) - Service Manual (64 pages)
- EverHot (interior) Venting Components - Installation Manual (16 pages)
- Heat Exchanger - Installation Manual (1 page)
- Gateway RER - Manual (33 pages)
- INDIRECT-FIRED - Installation, Operation and Maintenance Instructions (36 pages)
- M4-LHS - Installation Manual (55 pages)
- MagnaTherm MGH - Installation, Operation and Maintenance Instructions (104 pages)
- Mascot LX MLXH 50 MBH - Install and Operating Manual (56 pages)
- MC4EXT - Install and Operating Manual (4 pages)
- Mighty Stack MS-080 (Sizes 199, 300, 399) - Install and Operating Manual (36 pages)
- Mighty Therm HH-PH (Sizes 175-400) - Installation, Operation and Maintenance Instructions (28 pages)
- Mighty Therm VW-PW (Sizes 175-400) - Installation, Operation and Maintenance Instructions (32 pages)
- Mighty Therm AP (Sizes 2000-5000) - Installation, Operation and Maintenance Instructions (20 pages)
- Mighty Therm HH (Sizes 2000-5000) - Installation, Operation and Maintenance Instructions (24 pages)
- Mighty Therm VW (Sizes 2000-5000) - Installation, Operation and Maintenance Instructions (24 pages)
- Mighty Therm AP (Sizes 500-1825) - Installation, Operation and Maintenance Instructions (28 pages)
- Mighty Therm HH (Sizes 500-1825) - Installation, Operation and Maintenance Instructions (28 pages)
- Mighty Therm VW (Sizes 500-1825) - Installation, Operation and Maintenance Instructions (32 pages)
- Mighty Therm2 MT2H (Sizes 500–2000 MBTU/h) - Install and Operating Manual (40 pages)
- Mighty Therm2 MT2H (Sizes 200, 300, 400) - Install and Operating Manual (42 pages)
- Mighty Venter MV1 (Sizes 175-400) - Install and Operating Manual (12 pages)
- Mighty Venter MV2 (Sizes 500-1825) - Install and Operating Manual (12 pages)
- Mighty Therm2 MT2P (Sizes 500–2000 MBTU/h) - Install and Operating Manual (32 pages)
- Mini-Therm JVH (Sizes 50-225) - Install and Operating Manual (40 pages)
- Multi Flue CF-38-3 - Install and Operating Manual (16 pages)
- NeoTherm LC NTH1000 - Install and Operating Manual (140 pages)
- NeoTherm LC NTH (Sizes 1000-1700 MBTU/h) - Installation Manual (6 pages)
- NeoTherm NTH (Sizes 285–850 MBTU/h) - Installation Manual (4 pages)
- NeoTherm NTH (Sizes 080–285 MBTU/h) - Service Manual (110 pages)
- NeoTherm NTH (Sizes 080–850 MBTU/h) - Start Up Guide (16 pages)
- NeoTherm NTH (Sizes 080–850 MBTU/h) - Install and Operating Manual (92 pages)
- NeoTherm NTH (Sizes 399-850 MBTU/h) - Service Manual (118 pages)
- Pennant PNCP - Install and Operating Manual (40 pages)
- Pennant PNCH (Sizes 500-2000) - Install and Operating Manual (64 pages)
- Pennant PNCH - Install and Operating Manual (44 pages)
- Rheos RHCH - Install and Operating Manual (60 pages)
- Rheos Side-Wall Ducted Combustion Air Terminal - Service Manual (1 page)
- Rheos Side-Wall Vent Termination - Service Manual (1 page)