2 unpacking, 1 installation, 2 list of items supplied – KERN & SOHN EMB 500-1GN User Manual
Page 7: 3 battery operation, 4 mains supply, 5 initial start-up
5.2
Unpacking
Carefully remove the balance from its packaging, remove the plastic wrapping and
position the balance in its intended working location.
5.2.1 Installation
Install the balance in such a fashion that the weighing plate is absolutely horizonta
5.2.2 List of items supplied
Standard accessories:
KERN EMB
• Balance
• Operating manual
• Battery 1 x 9 V
5.3
Battery Operation
Remove the battery cover from the bottom of the balance. Connect 1
x
9 V Block-
Battery. Re-insert the battery cover.
Battery conservation through automatic power-off 3 minutes after ending a weighing
operation.
When the battery power is used up the display will show “LO“. Press the
key
and change the batteries at once.
When the balance is not in use for a longer period of time remove batteries and keep
them separately. Leakage of battery liquid might damage the balance.
5.4
Mains supply
Electric power supply is by means of the external mains supply circuit. The printed
voltage level must comply with the local voltage.
Only use original KERN mains supply circuits. The use of other makes is subject to
approval by Kern.
5.5
Initial start-up
A warm-up time of 3 minutes stabilises the measured values after switching on.
The accuracy of the balance depends on the local acceleration of the fall.
Please be sure to observe the information in the chapter on adjusting.
EMB-500-1GN-BA-e-1410
7