Jaypro Sports FBGP-720 User Manual
Page 2
T:\Aftermarket\Football\Drawings\FGBP-720\DOCUMENTATION\FBGP-720 Installs.doc
REV D 4/10
1
FBGP-720 SERIES
OFFICIAL 6’ OFFSET FOOTBALL GOAL POST
- PERMANENT AND SEMI-PERMANENT INSTALLATIONS -
LIST OF MATERIALS
ITEM NO. PART
NO.
DESCRIPTION QTY.
1
HS5119
Bolt-HX HD ½”-13x5”
8
2
HS5066
Bolt-HX HD ½”-13x7 ¾”
4
3
HN268
½”-13 LOCK NUT
12
4
HW2044
½” FLAT WASHER
12
5
HS1616
Bolt-3/8”-16x2 ¾”
8
6
HN1230
3/8”-16 LOCK NUT
8
7
HW2047
3/8” FLAT WASHER
8
8
SR167
½-13 x 8 in THREADED ROD
1
9
HN5038
½-13 FLANGE NUT
2
IMPORTANT
1) The location of the gooseneck with respect to the field is critical. By rule, the
front of the crossbar should be even with the field side (inside) edge of the end
line such that the crossbars measure 360 ft apart, inside to inside. The distance
from the end line to centerline of the bottom upright (gooseneck) is approximately
78” for the FBGP-720 series. See Figure 1
2) The footing depth is dependant on the type of installation, permanent or semi-
permanent. For permanent installations see Figure 3. For a semi-permanent using
a standard ground sleeve (Part No. FBSLV6) see Figure 4, and for a semi-
permanent with height adjuster see Figure 5. Materials for the semi-permanent
with height adjuster installation (Part No. FBGPGS-6) include the ground sleeve,
height adjuster and hardware.
3) Concrete should be a minimum 4000-psi mix.
4) The crossbar should be level and at a height of 10 ft above ground level. The
uprights should be plumb in both directions, front to back and side to side.
Adjust goal components as necessary. Note that a certain amount of deflection in
the crossbar is to be expected due to the weight of the end fittings and uprights on
each end.