Maintenance instructions, Important – EDCO CPM-10 User Manual
Page 17

E-CPL8-CPM-4-8-10-I-0112
Printed in USA
TVW
©2012
Page 17
100 Thomas Johnson Drive, Frederick, MD 21702-4600 USA
Phone (301) 663-1600 • 1-800-638-3326
Fax (301) 663-1607 • 1-800-447-3326
Website: www.edcoinc.com
Email: [email protected]
Never work on or under equipment without first securing the equipment to prevent it from mov-
ing or falling. Always work on a flat and level surface.
Refer to the Engine/Motor Manufacturer’s Owner’s Manual
for maintenance information specific to the engine/motor used.
Grease cutter assembly bearings (2 ea)
after every 4 hours of use.
IMPORTANT!
Remove spark plug lead on gasoline/propane engine models
or disconnect the supply voltage connector on
electric models before performing any maintenance.
Disconnect the power cord at the machine.
Maintenance Instructions
Grease Depth Control grease point
every 40 hours.
Depth Control
Grease point
all models.
Bearing
Cutter Assembly
Bearings (2)
Jacking Bolt
CPM 8 & 10
CPM 4
Cutter assembly
bearings (2)
CPL-8
Wheel
Depth Control
Multi Vac Port
CPM-8 Electric
Power Switch
Manual Reset
Button
Multi Vac Port