Once the boxes have been joined, the front dolly panels can be removed. The next boxes should be

attached “one by one” using the methods described. Finally, the array should be hoisted to the correct height
and secured with slings to avoid swinging.

This method is more time consuming than assembling an array by the “all at once” procedure, but is

appropriate for situations due to a lack of space in which to array the system. During the process, the safety
pins should be checked making sure they are secured correctly. Once the complete array has been lifted into
place, additional slings should be attached to secure the array and avoid swinging.

Assembling an array using the

platform

PL-50

The

platform can be used to easily

transport

units to the assembling area. To

use this method of assembling and hoisting the
array, there must be enough space to permit
linking all the boxes from the front of the rigging
hardware.

The first step will be to attach the

grid and the hoist (or hoists). Once this has been
accomplished, the rigging structure can be placed
in a vertical position by lifting the rear hoist and
lowering the front hoist so that the rear of the grid
is on top and the front of the grid at the bottom,
ready to receive the first box.

PL-50

aero 50

AX-AERO50

The next step is to attach the first unit to the

grid by introducing the G1A50 and G2A48 guides
in the receiving points of the grid structure and
assuring them with the (6) safety pins. The safety
pins should be inserted in the slot of the G2A48. It
is very important to make sure that the pins have
been inserted and locked correctly.

9

6

1

3

5

4

2

1

13

16

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

14

17

15

19

16

16

16

16

16

16

16

20

20

20

20

20

20

20

15

18

14

17

12

15

11

14

10

12

8

10

6

8

LX

æro

MAX. NUMBER OF UNITS ALLOWED

FRONT

REAR

Once the first box is attached to the structure, the remaining boxes should be brought to the array and

attached repeating the previous steps (1 and 2) using G1A50 guides and safety pins per side making sure
that the pins have been inserted and locked correctly.

Proceed to attach the remaining units in the same manner until all the array units are attached to one

another. For example, if we are assembling a six unit array, the process will be repeated six times. When all
the units are attached, the complete array is ready to be hoisted.

1

2

Manual del Usuario

/ aero 50, LX-218 LX-218R /

&

User’s Manual

This manual is related to the following products: