beautypg.com

Step 6: sanitizing, pressure testing & purging – Kenmore ULTRAFILTER 300 625.384720 User Manual

Page 9

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

background image

- STEP 6: SANITIZING, PRESSURE TESTING & PURGING -

SANITIZING

Sanitizing is recommended upon installation of the
RO system^ and after servicing inner parts.

It is im­

portant for the service person to have clean hands
while handling inner parts of the system.

CAUTION: Be sure to remove the RO membrane
and both filter cartridges as follows, before sanitiz­
ing. Chlorine will destroy the RO membrane car­

tridge.

1.

Be sure the

water supply to the RO is turned off,

and the

RO faucet is open

to relieve pressure.

2. Referring to FIG, 9, page 12, remove the RO mem­
brane sump by twisting 1/4 turn left (O). Remove
the RO cartridge from sump. Place the cartridge in
a

clean

plastic bag.

3. Be sure the o-ring seal is on the sump. Replace the
RO sump by turning to the right (U) to lock.

4.

Remove the postfilter sump, turning to the left.

Take the cartridge from the sump and place in the
plastic bag. Replace the sump by turning to the right

(U) to lock.

5. Remove the prefilter sump and cartridge. Also
place this cartridge in the clean bag.

6. If needed to clean, flush the prefilter sump with
fresh water. Then fill with water to about 1" from the
top. Add 1.0 ounce of chlorine (ordinary 5.25%
household bleach,.. Hilex, Clorox, etc,) and mix in the
water.

Do not add chlorine first.

Concentrated it will

attack plastics.

7. Carefully replace the sump on the prefilter head
and turn to the right (U) to lock.

8. Slowly open the water supply to the RO,

9.

Open the RO faucet by turning knob to the left.

10.

Allow water to circulate through the RO system

until you smell the bleach odor at the faucet. Then
close the faucet and allow the RO to stand idle for 20
minutes.

11.

After the 20 minutes open the RO faucet and run

water until the bleach odor is gone.

12. Turn off the water supply to the RO.

13.

Be sure your hands are clean. Then, repeat steps

1 - 5

and

7,

only

replace all cartridges.

Important: Refer to FIG. 9, page 12, and to page 13
when replacing cartridges. The prefilter (left side)
cartridge and the postfilter (right side) have puple
end caps.

PRESSURE TESTING

1. Do the preceding sanitizing procedures before
pressure testing.

2. Open the water supply shutoff valve to the RO.

3. Open the

main

water supply valve and several

house faucets to purge air from the system. Close
faucets when water runs smooth.

4. In about 2 hours, pressure will start to build in the
RO system.

Then,

carefully check all fittings and con­

nections for water leaks. Correct leaks if any are
found.

Note: When the system is first pressurized, water
may "spurt" from the faucet airgap hole until air is
expelled from the RO system.

PURGING RO MEMBRANE

Important purging instructions: The RO cartridge
contains a food grade preservative that should be re­
moved before using water from the system. The pre­
servative will give product water an unpleasant taste
and odor.

1. Allow the storage tank to fill for about 4 hours.
Then open the RO faucet until the tank is empty and
flow stops.

2. Close the RO faucet and allow the tank to fill again
for 4 hours. Then open the RO faucet and empty
again.

Repeat steps 1 and 2 to purge the storage tank 6 times. Then the RO system is ready to
make product water for use.

Problems, Questions? Call 1 -800-426-9345 Kenmore Water Une

This manual is related to the following products: