Carl Goldberg GBGP0105 User Manual
Page 6

6
11. Tape the battery box cover in place flush with
the front and back panel and the floor. Tape the
power panel in place flush with the front panel and
sitting on top of the battery cover. Using a 5/64”
drill, drill through the holes in the power panel and
battery cover to make pilot holes for the #4 screws.
Install the 10 #4 x 3/8” sheet metal screws to hold
the panels in place.
12. Install the 1” wooden handle in the holes on
each upright. Due to the tolerance of wooden dowels,
the holes will probably be very tight and may require
sanding to get a good fit.
13. The top shelf divider can be installed in the
middle or at any spacing you desire. It is
1/8”x3.156”x10.43”.
14. This finishes the assembly of the box. You
will now need to build the six drawers. Each drawer
is bagged separately to help you identify the parts. It
is suggested you open one bag at a time and com-
plete that drawer.
15. After the drawers are built you can install the
drawer pulls using the #10x5/8” screw. It is a good
idea to glue the know on also.