6.9 Avoid slugging
7.1 Preparation
7| Maintenance
To prevent slugging:
 The complete refrigeration plant must be properly designed.
 All components must be compatibly rated with each other with regard to output (particularly the 
evaporator and expansion valves).
Suction gas superheating at the compressor input
should be > 10 K (check the setting of the
expansion valve).
	 The	system	must	reach	a	state	of	equilibrium.	
	 	Particularly	in	critical	systems	(e.g.	several	evaporator	points),	measures	such	as	the	use	of	liquid	
traps,	solenoid	valve	in	the	liquid	line,	etc.	are	recommended.	 
There should be no movement of refrigerant in the compressor while the system is at a 
 standstill.
Regard oil temperature and pressure gas temperature (the pressure gas temperature has to be
high enough, so the oil temperature is > 30°C.
ATTENTION Slugging can result in damage to the compressor and cause
refrigerant to leak.
WARNING
Before starting any work on the compressor:
 Switch off the compressor and secure it to prevent a restart.
 Relieve compressor of system pressure.
	Prevent	air	from	infiltrating	the	system!
After maintenance has been performed:
 Connect safety switch.
 Evacuate compressor.
	Release	switch-on	lock.
WARNING
The decompression has to be carried out in a way that no dry ice 
respectively solid CO
2
is produced which blocks the outlet and
could hinder the streaming out of CO
2
. Otherwise, there is the dan-
ger that pressure can be built up again.
6| Commissioning