5 | electrical connection – GEA Bock HGX46 CO2 T User Manual
Page 19

 D
 GB
 F
 E
19
96259-12.2014-DGb
In the factory, the motor is switched for direct starting (YY). For part winding start (Y/YY), remove the 
bridges and connect the motor feed cable according to the circuit diagram:
400 V
Direct start YY
Part winding start Y/YY
L1
L2
L3
L1
L2
L3
L1
L3
L2
PTC
PW
II
PW
I
PTC
ATTENTION Property damage possible.
Failure	 to	 comply	 results	 in	 reversed	 fields	 of	 rotation	 and	 can	
cause motor damage. After the motor has started up with part win-
ding	1,	part	winding	2	must	be	switched	on	after	max.	1	second	
delay. Failure to comply can be detrimental to the service life of 
the motor.
Ensure that power is supplied via K1 to winding 1 (66%) (1U1 / 
1V1 / 1W1) and via K2 to winding 2 (33%) (2U1 / 2V1 / 2W1). The 
motor contactors (K1/K2) are each to be rated for approx. 70% of 
the max. operating current.
5| Electrical connection