Cub Cadet 3000 Series User Manual
Page 46
![background image](/manuals/656870/46/background.png)
6 - 12
Cub Cadet 3000
Prior to the installation of the end cap, freely lubricate
the gerotor star seal ring.
Lubricate and install the o-ring seal into the groove
located in the gerotors outer ring.
Lubricate and install both the o-ring seal and seal ring
into the gerotor star. Install the o-ring in the groove
located in the star first and then the seal ring.
Figure 47.
Figure 46.
Figure 45.
Figure 48.
Install the end cap onto the gerotor assembly by
aligning the cap screw holes.
See also other documents in the category Cub Cadet Special machinery:
- G1332 (20 pages)
- i1046 (32 pages)
- i1046 (36 pages)
- 54M (28 pages)
- 980 (20 pages)
- 949 (20 pages)
- Time Save (28 pages)
- 990 (24 pages)
- 997 (36 pages)
- V469 (20 pages)
- 6 Fabricated Deck (36 pages)
- M48-M60-KW (28 pages)
- 4 Fabricated Deck (36 pages)
- 4 Fabricated Deck (32 pages)
- 6 Fabricated Deck (28 pages)
- 4 Fabricated Deck (32 pages)
- 4 Fabricated Deck (32 pages)
- 6 Fabricated Deck (32 pages)
- 4 Fabricated Deck (32 pages)
- CC 500 BAT (30 pages)
- CC 22 (20 pages)
- CC 949 (13 pages)
- 33" Wide Area (29 pages)
- Z-Wing (88 pages)
- TANK S Series: Electrical System (9 pages)
- TANK S Series: Hydraulic Drive & Steering System (12 pages)
- TANK S Series: Steering System Adjustments (11 pages)
- 640 (24 pages)
- 640 (20 pages)
- 641 (24 pages)
- 641 (20 pages)
- J466 (32 pages)
- Series C460 (28 pages)
- 435A (24 pages)
- 642 (24 pages)
- 414 (24 pages)
- M465 (28 pages)
- Fun Runner (117 pages)
- 4 x 2 Big Country - Steel Bed (38 pages)
- 4 x 2 Big Country - Poly Bed & Steel Bed (82 pages)
- 4 x 4 Volunteer (328 pages)
- 6 x 4 Big Country (121 pages)
- CC 4BP 32cc (29 pages)
- 2518-48 (60 pages)
- 1525 (39 pages)