BUCHI NIRFlex N-500 User Manual
Page 54

5 Putting into operation
54
NIRFlex N-500 Operation Manual, Version F
5 .8
Installing measurement equipment to the NIRFlex Fiber Optic SMA
To install the instrument, proceed as follows:
left connector = short spring
right connector = long spring
To mount the SMA-adapter onto the optical
fiber cable:
Put the spring onto the fiber connector
•
and secure the end of the connector with
the threadened spacer nut.
NOTE
The spring must be freely movable after
installation! Fasten the spacer nut handtight
only!
Insert the optical fiber cable.
•
Place it into the cable-slot of the stress
•
relief and swivel the stress relief to match
the screw heads at the SMA socket.
Push the stress relief against the spring
•
of the optical fiber cable and swivel it into
vertical position.
Fasten the two fixating screws of the
•
stress relief hand-tight.
Fixate the optical cable with cable ties.
•