Installation, Features, Specifi cations – Beckett 61687 GeniSys Display and Contractor Tool User Manual
Page 2
2
Installation
With a slotted screwdriver, carefully
remove the COM2 port cover on the right
side of the GeniSys control.
When installing the display, slide the
display down into place by slightly tipping
the display towards the rear to engage
the rear mounting fi ngers, then carefully
aligning the display receptacle with the
four COM2 pins on the control, and
pressing in place. No additional fastening
or wiring is required. See Figure 1.
When installing the contractor’s tool, plug
the connector from the interface cord into
the COM1 or COM2 port.
Features
32 character backlit alphanumeric display
Sealed pushbutton keypad
Low voltage operation
Continuous real-time cycle monitoring
Continuous cad cell resistance reading
Continuous AC line voltage read-out
•
•
•
•
•
•
Real-time error notifi cation
Customizable pre-time (valve-on delay)
& post-time (motor off delay)
15 cycle history monitoring
Five Year Warranty
Customizable lockout service message
•
•
•
•
•
Specifi cations
Electrical Ratings
Inputs:
Voltage: 5 Vdc +4%
Current: 25 mA maximum display
current
•
•
Environmental Ratings:
Storage Ambient Temperature: -22°F to
+150°F (-30°C to +65°C)
Operating Ambient Temperature: 0°F to
+150°F (-18°C to +65°C)
Moisture: 5 to 85% RH, non-condensing
and non-crystalizing
•
•
•
Contractor Tool cord must be oriented as
shown for proper operation.
Figure 1
Figure 2
The installation
of the cord plug
is position-sensitive. It must be
inserted with the embossed ‘UP’
in the up position, or the interface
connection will be ineffective. See
Figure 2.
After the contractor’s tool or the display
module has been installed on the control,
the current readings will be displayed.
Refer to Paragraph A. Also, readings for
the most recent 15 burner cycles can also
be displayed. Refer to Paragraph B.