beautypg.com

Full load and starting current, Secondary baffle, Maintenance instructions – Metalfab Bin Activator User Manual

Page 5

background image

5

Note:

Bin Activator vibrator should be electrically interlocked

with down stream feed devices, i.e., when screw, belt,
rotary, etc. feeder stops _ vibrator should also stop.

Full Load and Starting Current

See Vibrator Instruction Manual and Motor Nameplate Data.

Secondary Baffle

1. The secondary baffle has been positioned by Metalfab engineering for your

application requirements. ItÅfs position will allow for the proper flow of

product through the Bin Activator outlet.

2. The position of the secondary baffle is maintained by an Esna type lock nut.

The secondary baffle can be repositioned vertically by using a deep socket

type wrench to loosen the lock nut, thereby, allowing the secondary baffle to

be turned, possibly by hand, on the threaded section of the extended rod, to
a higher or lower position. Since the secondary baffle is located near the

outlet, it is easily accessible from the outlet.

3. If flow problems occur, the secondary baffle could be repositioned to help

eliminate the problem. Before making any adjustments, it is advisable to

check with Metalfab engineering for advise as to what new position might

be helpful.

Maintenance Instructions

1. Vibrator Lubrication

The vibrators are lubricated as supplied. The lubrication is good for 2,000 to
5,000 hours. See vibrator instructions.

2. Flexible Sleeve

Aside from checking the clamp tightness, there is no maintenance required on
the sleeve. Periodic visual checks should be made to see if there is damage

caused by chemical attach or mechanical damage to the elastomer.

Note:

Standard sleeve is Neoprene with a maximum

temperature rating of 210ÅãF. Optional sleeves are NORDEL with a

maximum temperature rating of 325ÅãF and VITON with a

maximum temperature rating of 400ЕгF.