Appendix, Burner startup procedure, Chapter 6 appendix – B&C Technologies IS Series Commercial Ironer User Manual
Page 35: 1 burner startup procedure

Chapter 6
Appendix
6.1
Burner Startup Procedure
Tools needed:
• Slack Tube Manometer
• 1/8” pipe hose barb (for your manometer)
• 1/4” pipe hose barb (for your manometer)
• Volt Meter
Controls:
Refer to Figure 6.1 on page 33.
1. Gas Valve Pilot Coil
2. Gas Valve Main Coil
3. Pilot Gas Adjustment
4. Pilot Air Adjustment
5. Pilot Regulator
6. Main Air adjustment
7. Secondary Air Adjustment
8. Main Gas Cut-Off Valve
9. Shading Disk or Valve
10. Main Gas Pressure Test Port
11. Burner Pressure Switch