beautypg.com

Parts grouped by carton g – Workrite Sierra HXL Assembly Instructions for 2-Leg Front Crank Workcenters User Manual

Page 2

background image

2 of 8

Workrite Ergonomics | 800.959.9675 www.workriteergo.com

Workrite Sierra HXL™ 2-Leg Crank Workcenters - Assembly Instructions

S

Tabletop (size and shape differ

for each model)

Qty: 1

H

4 mm Allen Wrench

Qty: 1

I

M6 × 12 mm Button

Head Machine Screw

Qty: 8

J

M6 × 8 mm Button

Head Machine Screw

Qty: 12

Parts grouped by carton

G

Deep Hex Shaft

Qty: 1

F

Shallow Hex Shaft

Qty: 1

Q

Crank Tube

Qty: 1

D

Top Leg Bracket

Qty: 1

O

Top Leg Bracket

Qty: 1

K

#12 × ½" Self Tapping

Phillips Head Screw

Qty: 1

M

#12 × ¾"

Laminate Top Pan

Head Wood Screw

Qty: 32

OR

A

Leg

Qty: 1

N

Leg

Qty: 1

R

Feet

Qty: 2

L

M6 × 16 mm Flat Head

Machine Screw

Qty: 8

B

Short Bracket

Qty: 2

C

Medium Bracket

Qty: 2

P

Long Bracket

Qty: 1

E

Crank Handle Assembly

Qty: 1

#10 - 24 × ½"

Silhouette Top

Self Tapping Pan

Head Screw

Qty: 36

Verify that you have all the hardware and tools needed for the assembly

Check your cartons against the list above to verify that you have all the parts needed.

You will also need the following tools:

#2 tip Phillips screwdriver or drill/driver

#3 tip Phillips screwdriver or drill/driver

1

or

a

If you do not have a Workrite tabletop

you will also need:

⅛" pilot drill bit