Parts grouped by carton g – Workrite Sierra HXL Assembly Instructions for 2-Leg Front Crank Workcenters User Manual
Page 2
2 of 8
Workrite Ergonomics | 800.959.9675 www.workriteergo.com
Workrite Sierra HXL™ 2-Leg Crank Workcenters - Assembly Instructions
S
Tabletop (size and shape differ
for each model)
Qty: 1
H
4 mm Allen Wrench
Qty: 1
I
M6 × 12 mm Button
Head Machine Screw
Qty: 8
J
M6 × 8 mm Button
Head Machine Screw
Qty: 12
Parts grouped by carton
G
Deep Hex Shaft
Qty: 1
F
Shallow Hex Shaft
Qty: 1
Q
Crank Tube
Qty: 1
D
Top Leg Bracket
Qty: 1
O
Top Leg Bracket
Qty: 1
K
#12 × ½" Self Tapping
Phillips Head Screw
Qty: 1
M
#12 × ¾"
Laminate Top Pan
Head Wood Screw
Qty: 32
OR
A
Leg
Qty: 1
N
Leg
Qty: 1
R
Feet
Qty: 2
L
M6 × 16 mm Flat Head
Machine Screw
Qty: 8
B
Short Bracket
Qty: 2
C
Medium Bracket
Qty: 2
P
Long Bracket
Qty: 1
E
Crank Handle Assembly
Qty: 1
#10 - 24 × ½"
Silhouette Top
Self Tapping Pan
Head Screw
Qty: 36
Verify that you have all the hardware and tools needed for the assembly
Check your cartons against the list above to verify that you have all the parts needed.
You will also need the following tools:
#2 tip Phillips screwdriver or drill/driver
#3 tip Phillips screwdriver or drill/driver
1
or
a
If you do not have a Workrite tabletop
you will also need:
⅛" pilot drill bit