36

Inspection and Start-up Checklists

Receiving and Inspecting

Unit received undamaged

Unit received complete as ordered including accessories

Handling and Installing

Unit mounted on solid level surface

Sufficient space allowed for access to unit and accessories

Proper electrical service provided

Hot water provided to humidifier

Drain lines and trap installed properly

Ductwork, fittings and grilles installed properly

All cold duct surfaces insulated

Low ambient control included if freezing condition present

No obstructions to air flow to condenser

Starting-up the Unit

General visual inspection looks good

All wiring connections checked

All ducts, grilles and panels in place

Start unit

Check ducts and connections for air leaks

Balance air distribution

Confirm condenser airflow is unrestricted

Verify cooling and heating operation

Check for excessive noise or vibration