Smart Power Systems HR-110 User Manual
Page 19
Smart Power
®
Systems
A. C. MODULAR GENERATOR SYSTEM
Page 18 of 53
3.
Mount the tray assembly as high as possible within the structure of the vehicle. The
ideal location for the generator is at the top of the truck in the dunnage area. The
manufacturer must also take sufficient precautions to ensure that the generator is
not mounted in the path of the deck gun/water cannon.
4.
Mount the hydraulic generator tray securely to vehicle. Secure the generator to the
floor of the enclosure using mounting hardware (not included), as shown (reference
Figure 8).
1/2-13UNC Screw
1/2” Flat
Washer
Generator
Tray
Dunnage
Area
Floor
1/2” Flat Washer 1/2”
Lock
Washer
1/2-13UNC Nut
Figure 8
WARNING:
Never mount the Generator on its side or upside down. Always mount the generator
upright with its base horizontal. Improper mounting will lead to poor performance
and damage to the system and will void the system’s warranty.
Never operate an AC modular generator system that is not secured in place;
damage will result.
Do not mount the hydraulic pump, cooler/fan assembly or tray assembly in any
location that is not well ventilated. External heat sources elevating the hydraulic
fluid and/or the generator temperature will result in premature wear and degraded
system performance and void the system’s warranty.
5.
If desired, reservoir and cooler/fan assemblies can be remote mounted. Contact
Smart Power Systems at (231) 832-5525 to review remote mounting applications
and to order remote mounting kit, PN 1500065.