Smart power – Smart Power Systems HR-110 User Manual
Page 15

Smart Power
®
Systems
A. C. MODULAR GENERATOR SYSTEM
Page 14 of 53
MINIMUM
1.00
CLEARANCE
CLEARANCE
MINIMUM
.50
.50
MINIMUM
CLEARANCE
15.00
AIR VENT OPTION A
(IF AIR VENT OPTION B OR C IS USED
.50 CLEARANCE REQUIRED ON THIS SURFACE)
AIR VENT OPTION B
(IF AIR VENT OPTION A OR C IS USED
.50 CLEARANCE REQUIRED ON THIS SURFACE)
AIR VENT OPTION C
(IF AIR VENT OPTION A OR B IS USED
.50 CLEARANCE REQUIRED ON THIS SURFACE)
Bottom view of HR-6.2, HR-8, HR-10 and HR-110 tray assemblies showing minimum
clearance for proper ventilation and the three possible air vent options
Figure 3
Front view of HR-6.2, HR-8, HR-10 and HR-110 tray assemblies showing tray
dimensions and minimum clearance for proper ventilation
Figure 4