Pull handle installation, Standard pull handle installation – Oldcastle BuildingEnvelope Thermal Clad Door and Frame User Manual
Page 29

STANDARD PULL HANDLE INSTALLATION
D O O R A N D F R A M E
PH-20 Pull Handle will be shipped with screws for attachment. Holes are pre-drilled in the stiles at the factory.
Where PH-20 is not used with PB-21 (PH-20TB):
Step 1: Lay out the parts to be sure they are all there.
Step 2: Place washers over through-bolts.
Step 3: Align pull with holes in door stile.
Step 4: Insert through-bolts into holes in stiles from exterior of door.
Step 5: Tighten bolts into pull.
Where PH-20 is used with PB-21 (PH-20/PB-21):
Step 1: Lay out the parts to be sure they are all there.
Step 2: Align PH-20 with top hole on exterior of door.
Step 3: Insert through-bolt stud from interior of door through top hole into PH-20.
Step 4: Place washer on 1/4" diameter through-bolts.
Step 5: Insert through-bolt from interior through bottom hole into PH-20.
PH-20BTB back-to-back pulls:
Step 1: Lay out the parts to be sure they are all there.
Step 2: Align pull with holes on exterior of door.
Step 3: Insert through-bolt stud from interior of door through top hole into pull.
Step 4: Insert through-bolt stud from interior of door through bottom hole into pull.
Step 5: Loosen setscrews in push.
Step 6: Place push over studs and tighten setscrews.
Wire Pull Replacement for PH-10 shipped with studs for use in pre-existing riv-nuts.
Step 1: Lay out the parts to be sure they are all there.
Step 2: Remove existing PH-10.
Step 3: Install studs into existing riv-nuts.
Step 4: Back out setscrews in replacement pull handle.
Step 5: Align replacement pull handle over studs.
Step 6: Tighten setscrews.
29
MAY 2012
D O O R & F R A M E
I N S T A L L A T I O N M A N U A L
Web Address: www.oldcastlebe.com
Phone: 1-866-OLDCASTLE (653-2278)