Pg18 install_hinges, Ad-375 thermal door – Oldcastle BuildingEnvelope AD-375 Thermal Entrance User Manual
Page 20

INSTALLATION OF OFFSET HUNG DOOR ON BUTT HINGES
Back-up plates are installed in the door and the frame at the factory. Butt hinges should be installed on
the door using FS-22 (#12-24 x 1/2" UCPFH) fasteners. The door may or may not be glazed prior to
installation of door.
1. Lift door upwards until butt hinges align with hinge cutout in frame.
2. Block under door when hinge and cutout are aligned.
3. Attach hinges to frame back-up plates using FS-22 fasteners (included). There is a slight
adjustment available if location of door prep and frame cut out is off slightly. Back off on screws
slightly and adjust door to proper position; then, tighten down screws.
4. Now that the door is hung, it is time for final adjustments and attachment of hardware.
Note; if you have not pre-glazed the door; glaze the door before attachment of hardware or
further adjustments.
INSTALLATION OF OFFSET HUNG DOOR ON GEAR HINGES
Door and frame will be pre-drilled for Pemko FM-SLI gear hinge. Gear hinge should be installed onto
door using supplied fasteners. The door may or may not be glazed prior to installation.
1. Lift door upwards until hinges align with pre-drilled holes in frame.
2. Block under door when holes in hinge and frame align.
3. Attach gear hinges to frame using supplied fasteners.
4. Now that the door is hung, it is time for final adjustments and attachment of hardware.
Note; if you have not pre-glazed the door; glaze the door before attachment of hardware or
further adjustments.
NOTE:
Thermal Doors are not available with Offset Pivots due to weight of door and weathering considerations.
Phone: 1-866-OLDCASTLE (653-2278)
Web Address: www.oldcastlebe.com
18
MAY 2013
AD-375 THERMAL DOOR