beautypg.com

Pyromaster, H33bdvrrn/p – Vermont Casting H33BDVRRN User Manual

Page 17

background image

17

Pyromaster

©

H33BDVRRN/P

10004798

If there is room above ceiling level,
firestop spacer must be installed on both
the bottom and the top side of the ceiling
joists. If an attic is above ceiling level a
7DVAIS (Attic Insulation Shield) must be
installed. (Fig. 31)

The enlarged ends of the vent section
always face downward. (Fig. 33)

Typical Roof

Support Application

Typcal Ceiling

Support Application

FP1184

Fig. 32 Typical support applications.

6. Place firestop(s) #7DVFS or Attic Insulation Shield

#7DVAIS into position and secure. (Fig. 31)

7. Install roof support (Fig. 32) and roof flashing

making sure upper flange is below the shingles.
(Fig. 33)

8. Install appropriate pipe sections until the venting is

above the flashing. (Fig. 33)

9. Install storm collar and seal around the pipe.

10. Add additional vent lengths for proper height. (Fig

34)

11. Apply high temperature sealant to 4” and 7” collars

of vertical vent termination and install.

11"

11"

Joist

Attic
Insulation
Shield

Ceiling
Installation

Upper Floor

Joist

Firestop Spacer

Nails (4)

CFM100

Fig. 31 Place firestop spacer(s) and secure.

Min.

2’ (610 mm)

CFM190

Fig. 34 Minimum termination to roof clearance.

#5 Sheet Metal
Screws
(3 per joint)

Sealant

Storm
Collar

#5 Sheet
Metal
Screws
(3 per joint)

Sealant

Storm
Collar

TWL101a

Fig. 33 Roof flashing.

This manual is related to the following products: