beautypg.com

Pyromaster, H33bdvrrn/p, Rear wall installations – Vermont Casting H33BDVRRN User Manual

Page 11

background image

11

Pyromaster

©

H33BDVRRN/P

10004798

STEP 1

Locate vent opening on the wall. To locate hole center
consult with appropriate fireplace dimensions, Page 4.
Frame as shown below.

Combustible Walls: Cut a 10

³⁄₈

”H (264 mm) x 9

³⁄₈

” W

(240 mm) hole through the exterior wall and frame as
shown. (Fig.13)

Noncombustible Walls: Hole opening must be 7

¹⁄₂

(190 mm) in diameter. (Fig. 13)

STEP 2

Measure wall thickness and cut zero clearance sleeve
parts to proper length (MAXIMUM 12”/305 mm).
Assemble sleeve and attach to firestop with #8 sheet
metal screws (supplied).

Rear Wall Installations

20" (508mm)

Max.

20"

(508mm)

Max.

45

¡

20"

(508mm)

Max.

45

¡

Top View

Straight Venting

Top View Cross Corner Vent

to the Left

Top View Cross Corner Vent

to the Right

Fig. 12 Rear vent applications.

Max. Length
12” (294mm)

#8 Screws
(2)

#8 Screws
(2)

Adjustable Zero
Clearance Sleeve

Adjustable
Zero
Clearance
Sleeve

Firestop

H8
Screws

ZCS101

Fig. 14 Adjustable zero clearance sleeve.

STEP 3

Measure from the fireplace collar or elbow face to face
of outside wall (add 2” for vent pipe overlap). Mark
pipes and cut to length. It is very important that the two
pipes are flush with the outside wall once the fireplace
is in its final location.

Zero
Clearance
Sleeve

Firestop

CFM133

Fig. 15 Zero clearance sleeve and firestop installation.

STEP 4

Slip 4” and 7” pipes onto respective flue collars. Make
sure to fix to the fireplace collar the 4” pipe with three
(3) screws before fixing the 7” pipe on the 7” collar.
Both pipes must be on a level plane. (Fig 16)

Vent Opening for Combustible Wall

9

³⁄₈

(240mm)

10

³⁄₈

(254mm)

Framing Detail

7

¹⁄₂

(190mm)

Vent Opening for Noncombustible Wall

VO584-100

Fig. 13 Straight out through the wall application.

This manual is related to the following products: