beautypg.com

General Hydroponics AF30 User Manual

Page 5

background image

ASSEMBLY

STEP 7

Setup the rest of the Growing Chambers
and install the Spraylines by following the
directions provided with the Spraylines.

STEP 8

The level of the water in the Growing
Chamber
is controlled by the height of
the DLT. Keep the DLT access covered with
the DLT Cover.

STEP 9

Attach each of the Spraylines to
the Manifold and then the Flexible
Pumpline
to the Manifold. Make
sure there is a rubber gasket in the
Sprayline fitting and DO NOT OVER
TIGHTEN
. Cover the inspection hole
with the Hatch Cover

This manual is related to the following products: