Jambs, Bj i, Bumpers – Coral Industries Style Bypass (3/16 Frameless) - 20R1-G User Manual
Page 3: Header, Towel bar bracket kit

20R1-G 1/07
Position sill on centerline of tub with tall edge toward
outside of tub. If necessary for a smooth fit, file corners of
sill to fit contour of your unit. Tape sill to tub with masking
tape. This will help hold sill in place while positioning
jambs.
Jambs (B) are installed with notched shape firmly on sill.
Align jamb vertically using a level and mark wall through
prepunched holes. Repeat procedure with remaining
jamb. Remove jambs from tub and drill where marked
using 1/8" drill bit.
When anchors (K) are used holes should be drilled
using 3/16" drill bit. (Use masonry bit for tile.)
2
Jambs
(B)
Reposition jambs on tub and mount to wall using
8A x 1 1/4 " pan head screws (J). Top and bottom
holes are mounting positions for bumpers (I).
Measure from wall to wall (over the top of both jambs)
and cut header (C) to that measurement.
Lower header over jambs until seated squarely on both
jambs.
Attach header to jambs by drilling a 1/8" hole through
header into jambs on inside of tub near walls. Use
8A x 3/8" truss head screws (L) to secure header to
jambs.
8A x 1 1/4"
Pan Head
Screw
Measure
OUTSIDE OF
SHOWER
Jamb
B
Jamb
B
J
I
Bumper
Jamb
8A x 3/8"
Truss Head
Screw
L
Sill
A
Jamb
B
Jamb
B
B
3
Bumpers
(I)
4
Header
(C)
INSIDE OF SHOWER
B
Sill
Mark wall
through pre-
punched holes
and drill.
Level
Masking
Tape
Jamb
OUTSIDE OF BATH
Centerline
A
Header
C
Door
Bracket
Towel Bar
Bracket
Bracket
Sleeve
8A x 1"
Flat Head
Screw
E
E
Slide bracket sleeves from towel bar bracket kit (E)
onto towel bar brackets. Mount towel bar brackets
onto metal door brackets using 8A x 1" flat head
screws.
5
Towel Bar Bracket Kit
(E)