Securing sill k, Aligning / securing verticals – Coral Industries 6000 Swing Door/ILP - 063 User Manual
Page 6
![background image](/manuals/635562/6/background.png)
063-GP 11/06
Adjust alignment of door panel, magnetic door stop,
double channel, and in-line panel so that magnetic
strips align evenly and door closes with an even gap.
Once desired alignment of parts has been achieved,
working from inside of shower, drill four evenly spaced
holes through leg of jambs (1/4" from edge) into panel
and door stop. Secure using 8A x 3/8" truss head
screws (K).
Secure double channel in same manner by drilling, from
inside of shower, four evenly spaced holes 1/4" from
edge of double channel into panel and door stop.
Secure using 8A x 3/8" truss head screws.
Secure header by drilling, from inside of shower, through
header into jambs and double channel. Secure using
8A x 3/8" truss head screws.
When securing parts together, work from inside
of shower. Do not drill through to front (outside)
surface. Do not hit glass with drill bit. Glass is
seated approximately 1/2" into channel.
INSIDE OF SHOWER
C
Header
Door Panel
Jamb
8A x 3/8"
Truss Head
Screw
K
In-Line
Panel
B
1/4"
Working from outside of shower, drill through sill into
double channel. Secure using 8A x 3/8" truss head
screw.
In-Line
Panel
OUTSIDE OF SHOWER
8A x 3/8"
Truss Head
Screw
Double
Channel
Door
Magnetic
Door
Stop
1/4"
1/4"
Double
Channel
Door
Stop
D
INSIDE
OF SHOWER
8
Securing Sill
K
7
Aligning / Securing Verticals