beautypg.com

11b 1a – Alumax P-DR1W-48-60 User Manual

Page 5

background image

5

GASKET INSTALLATION

1

1B

1A

Place door panel (6) inside tub to simplify following

installation procedures. Ensure placing the panel

onto a cushioned surface, such as a towel or card

board, to prevent damage either to the panel or

the tub.

Using the cardboard packaging box as platform,

install bottom door gasket (17) onto door panel

(6) using a block and a mallet. Notice the gasket

orientation.

1B

Thoroughly clean the edge of the fixed panel (7).

Split the door gasket (9) in two and apply the

smaller half of the gasket on the edge of the fixed

panel.

7

6

17

6

1A

INTERIOR

SHOWER SIDE

INTERIOR

SHOWER SIDE

10