Maintenance, Operation of the dv power vent system – Vermont Casting 7PDVS User Manual
Page 15

15
DV Power Vent System
10003262
Turn the switch ON/OFF or the wall thermostat, to the ON position.
Blower will start immediately and will purge the unit and the vent system for 45 seconds. At that point, the pilot will light
and the main burner(s) will follow.
When the switch ON/OFF or the wall thermostat, is turned to OFF, the main burner and the pilot will shut-down immedi-
ately and the blower will run for 45 seconds to clear the flue gases before turning OFF.
If the unit is ON but the flame is unstable (ON and OFF continuously), turn the switch to the OFF position and call a
serviceman to check the installation.
The DV Power Vent System box is a maintenance free system. The motor bearings are pre-lubricated for extended life
and no further lubrication is required.
It is recommended however to have the system checked once a year by a qualified professional.
Maintenance
Operation of the DV Power Vent System
- RHE32 (38 pages)
- R24CFL (14 pages)
- 3399 (38 pages)
- DVRT41 (48 pages)
- Montpelier Wood Insert MEAD3CB (12 pages)
- Insert Studio LHER30 (8 pages)
- SR18SHK (16 pages)
- PerfectView 33LDV (4 pages)
- SC42 (24 pages)
- 3030 (26 pages)
- EF22 (16 pages)
- DV360 (56 pages)
- DV580 (60 pages)
- SA24SKHRN (20 pages)
- SHR42A (24 pages)
- VL21 (20 pages)
- DEF (11 pages)
- 7TDVP8 (3 pages)
- DVRT39 (50 pages)
- HiStyle DVBR42RN (2 pages)
- ICVCTK01 (12 pages)
- RFSDV24 (36 pages)
- HEF22 (12 pages)
- NV360 (24 pages)
- NVBC42 (24 pages)
- VCEF33 (12 pages)
- Romanesque HG004 (4 pages)
- Designer Select Series (4 pages)
- OD24SHKN (12 pages)
- BR36 (24 pages)
- CVR36 (28 pages)
- H33BDVRRNP (32 pages)
- 2080 (24 pages)
- DEF33 (16 pages)
- Allura-Fire Electric Fireplaces EF26 (1 page)
- EF26 (2 pages)
- DBR33 (32 pages)
- DEF33CE (12 pages)
- HEF33 (14 pages)
- D232 (28 pages)
- RHEDV25 (38 pages)
- Allura-Fire Markham Combo MKWWH33 (2 pages)
- BREF42R (24 pages)
- DBT39 (34 pages)
- CR36R (24 pages)