Step 2 position & install header bracket, Sectional door and 1-piece door with track, Installation – Craftsman 139.535006 User Manual
Page 11: Piece door without track, Step 2, Installation 1-piece door without track, Position & install header bracket
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".
Installation
STEP 2
Position & Install Header Bracket
THE HEADER BRACKET MUST BE RfGIDLY FASTENED TO THE HEADER WALL OR CElLtNG. REINFORCE
WALL OR CEILING WITH 2x4 IF NECESSARY.
Locate height for header bracket by opening door to
highest point of travel as shown. Draw a horizontal
line on header wall 2" above high point This height
provides travel clearance for top edge of door
When headroom is not sufficient for 2" clearance,
bottom edge of bracket may be placed parallel to the
high point of travel, or bracket may be attached to
ceiling
Optional Quick Turn Brackets are designed for low
headroom installations They replace top brackets
and rollers on the garage door, thereby lowering the
high point of door travel Installation instructions are
contained in the accessory carton
Position bracket as shown (bottom edge of bracket
on horizontal line), Mark either top and bottom or left
and right bracket holes Drill 3/16" pilot holes and
fasten bracket
Lag Screws
INSTALLATION
SECTIONAL DOOR AND
1-PIECE DOOR WITH TRACK
SECTIONAL DOOR
CURVED TRACK
Ceiling
^
Header
'(
Bracket
ONE-PIECE DOOR
HORIZONTAL TRACK
JAMB HARDWARE
Track
t
Highest Point
of Travel
Door
INSTALLATION
1-PIECE DOOR WITHOUT TRACK
ONE-PIECE DOOR
NO TRACK
PIVOT HARDWARE
Header
k-l / Bracket
ONE-PIECE DOOR
NO TRACK
•JAMB HARDWARE
Highest Point
ol Travel
Locate height for header bracket by opening door to
highest point of travel as shown. Measure distance
from top of door to floor. Subtract actual height of
door Add 8" to the remainder See example below.
If the total number of inches exceeds the height
available in your garage, use the maximum height
possible On finished ceilings, do not position the
bracket closer than 1/2" from ceiling.
Measuring from top of door, draw a horizontal line on
the header wall at the determined height Position
bottom edge of header bracket on horizontal line,
centering bracket on vertical line. Mark either top
and bottom or left and right holes. Drill 3/16" pilot
holes and fasten with 5/16" x 1-7/8" lag screws as
shown above
EXAMPLE
0>
Distance from top of door (at
c
highest point of travel) to floor
92"
w
Actual height of door
-88"
Q
Remainder
4"
Add
+
8"
''
Bracket height on header wail
=12"
11