beautypg.com

Optional equipment for steam boilers – Chromalox CHPES-6A User Manual

Page 14

background image

OPTIONAL EQUIPMENT FOR STEAM BOILERS

AUXILIARY LOW WATER CUTOFF
Operation

Operation of this control is accomplished by sensing a minute AC

current flowing between submerged contact probe in the boiler shell.

When this minute AC current is conducted through an external cir-

cuit resistance up to 40,000 ohms or less, a signal of sufficient magni-
tude is present to trigger the SCR and, in turn energize the control
relay.

As the water level in the boiler drops below the level of the probe,

the AC current is broken and the control relay is de-energized. The
control will not energize until sufficient water is present in the boiler.
Specifications
Input Supply — 120 vac/50-60 hz
Detectable Range — 100,000 ohms
Probe Voltage — 24 Vac
Probe Current — 10 milliamps
Control Relay — Single pole double throw
WARNING: Control will not work with de-ionized or
demineralized water.

PROPORTIONING PRESSURE CONTROL FOR
SEQUENCER AND SCR CONTROLS
Typical Operation

Pressure variations cause the bellows to expand or contract.

Linkage between the bellows and the potentiometer wiper causes the
wiper to move across the windings on the potentiometer. This varies
the resistance between R and B, and between R and W, causing an
unbalance in the circuit connected to the controller.

A proportioning pressure control is used to regulate a motor driven

or solid state sequencer. The controller potentiometer, the feedback
potentiometer in the motor and a balancing relay in the motor form an
electric bridge circuit. As long as the pressure of the controlled medi-
um remains at the set point of the controller, the circuit is balanced;
i.e., equal currents flow through both sides of the balancing relay and
the relay contacts are open. When the circuit is balanced, the motor
does not run.

If the pressure of the controlled medium rises, the wiper in the con-

troller moves toward W. This unbalances the circuit so a larger current
flows through one side of the balancing relay. The “close” contacts in
the relay make, causing the motor to drive toward its closed position. As

the motor runs, the wiper on the feedback potentiometer moves in a
direction to balance the circuit. When the circuit is again in balance, the
balancing relay contacts open and the motor stops.

Similarly if the pressure of the controlled medium falls, the wiper on

the controller potentiometer moves toward B, and the “open” contacts
in the balancing relay make. The motor drives towards its open position
until circuit balance is achieved.

The slightest change in the pressure of the controlled medium will

cause a change in the number of elements energized to compensate for
it, thus keeping the pressure constant. This process is called modulation.
PROPORTIONAL PRESSURE CONTROL ONLY SUPPLIED
WITH SEQUENCER

Main Setting — Turn the adjustment screw until the indicator is

opposite the low point of the desired throttling range. That is, if the pres-
sure is to be held at a minimum of 50 psi, set the indicator at 50 psi. The
pressure will them be maintained between 50 psi and a higher pressure
equal to the 50 psi plus the throttling range.
THROTTLING RANGE SETTING L91B

After setting the indicator for the minimum pressure, turn the throt-

tling range adjustment screw until the throttling range indicator points to
the desired throttling range on the scale. This scale is graduated from
“min” to “F”. The value of each division varies with the scale range of
the instrument.

PRESSURE

VALUE EACH

SCALE RATING

DIVISION ON SCALE

0-15 psi

2.2 psi

20-300 psi

16.4 psi

Pressure scale rating will vary depending on pressure control supplied.
CHECKOUT

After the controller has been installed, wired, and set, it should be

tested with the system in operation. First allow the system to stabilize.
Then observe the operation of the controller while raising and lowering
its set point. Pressure should increase when the set point is raised and
decrease when the set point is lowered. Use accurate pressure testing
equipment when checking out the controller. Do not rely on inexpensive
gauges. The controllers are carefully calibrated at the factory.

If the motor or actuator runs the proper direction when the set point

is adjusted, it can be assumed that the controller is operating properly. If
it runs in the wrong direction, reverse the B and W wires. Observe the
action of the motor to see if it stabilizes. If the motor is moving con-
stantly, widen the proportioning range a little at a time, until the system
is stable.

14

Adjusting Screw

Differential Adjusting Screw

R

W

B

3

3

2

2

2

2

6

6

2

2

1

1

LWCO Probe

Aux. Low

Water Cutoff

O

O

O

R

H

C

1PS

C1 NO

L1 L2

1PS

BL

W

Y

2PS

BL

Auto

Blow

Down

System

BR

C1

W

W

Heater

Contactor

Feed Water

(Solenoid Pump)

R

1LT

W

Boiler On

2

GND

3

GND

1

GND

B

FU3

B 1PB On

Off

X1

X3 X2 X4

1 HTR

C1

Fuses Supplied

on Boilers Rated

Over 40 Amps.

FU

FU

FU

FU2

FU1

H1

H2

H3

H4

480V/120V

1.5 KVA

480V

3

60 HZ

L1

L3

L2

Typical Wiring for

Auxiliary Low Water Cutoff

Electronic Resistance Sensing

Amplifier for Auxiliary

Low Water Cutoff

(L91B) Proportioning Pressure Control used with Sequencer Control