After proper wiring and piping of boiler system is complete, testing of
controls can start. Before testing controls, it is recommended that
all contactor fusing be removed.
This is to prevent possible element
failure under test conditions.
A. OPERATING AND TESTING THE McDONNELL &

MILLER LOW WATER CUTOFF CONTROL.
1.
Be sure all valves from incoming water supply are fully open.

Turn boiler switch to “ON” position, pump or solenoid
valve will energize, allowing boiler to fill with water. Proper
water level is automatically reached with level control sup-
plied. Pump or solenoid feed will shut off at proper water level.
Contactor(s) will energize, supplying power voltage to ele-
ments.

2. Checking operation of pump switch. (Figure 1) With water

level visible in sight glass, partially open drain valve at bottom
of boiler. If automatic blowdown supplied, push manual blow-
down switch until valve open light is on, hold for few seconds.
Water level will fall, allowing float to trip pump switch to
“ON” position. Close drain valve or release manual blowdown
switch.
Pump motor or solenoid valve will energize and water level
will resume to normal level in sight glass.

3. Checking low water cutout switch operation, open drain

valve completely. If automatic blowdown supplied, push in
and hold manual blowdown switch until water level falls
enough to trip cutout switch. Close drain valve or release man-
ual blowdown switch. If low water cutout is automatic reset,
pump or solenoid will return water level to normal. If low
water cutout is manual reset, then manual reset button on
McDonnell & Miller low water cutoff control must be pushed
to complete circuit. Turn off boiler. Reinstall contactor
fuses.

WARNING: Be sure all electrical connections are tight
before energizing boiler. Reset all manual reset con-
trols by pushing reset buttons on: (1) high limit control
located on top of boiler and (2) McDonnell & Miller
located on the side of boiler.

Diagram 14

TYPICAL WIRING DIAGRAMS

3

GND

C1

CR

C2

C3

2PS

1PS

On

Off

FU16

IFS

O

O

Y

BR

B

B

1PB

1

2

W

R

Boiler

On

9.9

Heater Contactor

1LT

2 HTR

1 HTR

1L1

1L3

1L2

2L1

2L3

2L2

C1

C2

FU1

FU9

FU8

FU7

FU6

FU5

FU4

FU3

FU2

C3

3 HTR

3L1

3L3

3L2

L1

L3

L2

1

GND

2

GND

Heater Contactor

FU12

FU11

FU10

C4

4 HTR

4L1

4L3

4L2

Heater Contactor

Heater Contactor

346V 3Ø 50 HZ

220 VAC Single Phase Control Circuit

1

C4

1CR-1

BW

1CR-2

Customer Pump

Connection

FU

1 2 3

FU

4 5 6

FU

7 8 9

C1

C4

C2

3

HTR

2

HTR

1

HTR

4

HTR

1

2

2TB 1TB

3

GND

2

GND

1

GND

FU16

1PB

Cabinet Exterior Left Side

Cabinet Exterior Right Side

Panel Layout

Feed Water

Electrical

Connection

FU

10

11 12

C3

1CR

FU13

FU14

FU15

5L1

5L3

5L2

1

Mtr

Customer

Connect

Feed Water

Motor

10L

30L

20L

IT1

IT3

IT2

CR

Wire Color Code
B

= Black

BR = Brown
R

= Red

O

= Orange

Y

= Yellow

G

= Green

BL = Blue
W = White

11

A

C

D

B

Line

Pump

Low-Water

Cut-Off

Terminals

Alarm

Circuit

Terminals

Pump

Circuit

Terminals

Pump

Switch

Cut-off

and

Alarm

Switch

Adjusting

Screws

Figure 1 — Automatic Reset Low-Water Cutoff Junction Box

PRE-OPERATION CHECK