One at a time, pull the 2 strand bundles

through the throat of the eye. Pull the bundles

tight and tape them down on the back side of

the rope. Turn the rope over and repeat with the

remaining 2 bundles.

tape

11

A

2 x rope diameter (minimum)

Seize over the area (from the throat of the eye

down the standing part) for a distance of

2 times rope diameter (in inches) using nylon

seizing material.

11

B

2 x rope diameter (minimum)

Milk all of the excess cover slack from the

cover material down towards the standing

part of line. Tightly tape the cover to the

rope approximately equal to rope diameter

(in inches) back from the end of the cover.

Unbraid the cover strands from the tape to

the end.

Seize over the area for a distance of 2 times rope diameter (in inches) with nylon seizing material.
After seizing both ends of the cover material, apply a two-part urethane coating over the seized areas as

shown, extending the urethane coating 1/2 the length of the seized area on both sides of the seizing.

Seized area

Coated area

Seized area

Coated area

11

D

11

C

DOCUMENT Double_Braid_C2_Eye_Splice_Turbo 37.pdf

© 2012 Samson Rope Technologies, Inc. All rights reserved.

S/WD #108294 7/2012