Preventative maintenance – Carrier 52C User Manual
Page 13

13
PREVENTATIVE
MAINTENANCE
Preventative maintenance is essential to proper unit
operation, efficiency and longevity. To assure equip-
ment operates properly it must be properly main-
tained. Equipment operation should be checked and
verified several times during each year.
During regular unit inspection and maintenance, fol-
low the guidelines below:
• Wash both sides of outdoor coil
• Wash basepan and outdoor vent filter
• Wash the indoor coil
• Clean the blower wheel and front panel
• Clean or install new indoor-air inlet filter(s)
• Ensure knobs are secure and operable
• Inspect cord and receptacle
• Secure electrical connections
• Ensure front panel is properly mounted and not
damaged
• Ensure wall sleeve is installed properly
• Ensure heat and cool cycles operate properly
• Check power cord protective device by pressing the
TEST button, then pressing the RESET button.
- 42S (72 pages)
- 30GT (4 pages)
- 48SS060 (8 pages)
- 50ME (54 pages)
- 38AH024-034 (26 pages)
- ZC (28 pages)
- 30GA (12 pages)
- COMFORTLINK 48A2 (8 pages)
- 48HE003---006 (64 pages)
- 33ZCSECTRM (52 pages)
- 19XRV (40 pages)
- MODU-PAC 50DF (37 pages)
- 17DA (8 pages)
- SINGLE PACKAGED ELECTRIC COOLING UNITS 50GS (28 pages)
- 48JZ (N) 024-060 (30 pages)
- 30GX080-176 (8 pages)
- 50DL (24 pages)
- 50GL-A (4 pages)
- NP034-074 (72 pages)
- 40GXQ (12 pages)
- 30XA080-500 (8 pages)
- 39E (12 pages)
- 40KMQ------301 (10 pages)
- 38AE (12 pages)
- 48AW (118 pages)
- 38GXQ (28 pages)
- 48ES---A (38 pages)
- 48GL (22 pages)
- 48GH (22 pages)
- 40QA024-060 (24 pages)
- TJF004 (52 pages)
- 39LD (40 pages)
- 48DL (4 pages)
- 48/50TC04---28 (44 pages)
- 50EJ (56 pages)
- 17EX (120 pages)
- 50BA (24 pages)
- 50BB (16 pages)
- 50BB (8 pages)
- 50BJ (20 pages)
- 30H (16 pages)
- 48HJD005-007 (48 pages)
- 50ZP (6 pages)
- 50DP016 (16 pages)
- 50LJ008-014 (19 pages)