beautypg.com

Overview and site preparation – EcoPure ECOP30 User Manual

Page 8

background image

8

OVERVIEW

Read through the entire manual before beginning your

installation.

There are seven steps to installing your Drinking Water

system. They are as follows:

STEP A - Install Cold Water Supply fitting
STEP B - Install Drain Adapter
STEP C - Install Reverse Osmosis Assembly
STEP D - Install Storage Tank
STEP E - Install Reverse Osmosis Faucet
STEP F - Connect Tubing
STEP G - Sanitize, Pressure Test, Purge System

These steps are explained in detail over the next few

pages. Follow all steps. Reading this manual will also help

you receive and use all the benefits your Reverse Osmosis

system can give you.

PREPARE SITE FOR INSTALLATION

1. Before starting, close the hot and cold water shutoff

valves (See Figure 7).

2. Temporarily place tank and filter assembly into planned

location. Check position of items and space required for

proper installation. Ensure tubes may be routed without

kinking.

3. Remove tank and filter from planned location and set

aside.

NOTE: You must check and comply with all local

plumbing codes.

NOTE: Codes in the state of Massachusetts require

installation by a licensed plumber and do not permit

the use of saddle valves.

If you live in the state of Massachusetts, review plumb-

ing code 248-CMR of the Commonwealth of

Massachusetts before proceeding with the installation.

NOTE: For best system performance, the feed water to

the system should be softened or have hardness less

than 10 grains per gallon, with no iron.

FIG. 6

Overview and Site Preparation

Questions? Call Toll Free 1-800-693-1138

Monday- Friday, 7 AM - 6 PM CST

or visit www.ecopurewaterproducts.com

When you call, please be prepared to provide the model, date code and serial number,

found on the rating decal, located inside the cover.