beautypg.com

Installation, Siting the unit, Mounting the unit – B&G Network Depth User Manual

Page 21

background image

INSTALLATION


The display heads are supplied with a clip-in mounting
bracket which allows for easy installation, access from
behind is not necessary to secure the unit in place.
However to prevent theft and permanently fix the unit in
position, locking studs and thumb nuts are supplied.

SITING THE UNIT


All Network Instruments are designed for mounting on or
below deck. A mounting position should be selected where
they are:

Easy to read by the helmsman

On a smooth and flat surface

At least 100mm (4") from a compass

Accessible from behind for fitting locking studs if

required.

MOUNTING THE UNIT


Use the cutting template supplied to mark the centres of the
holes for the self-tapping screw, the fixing stud holes and
the mounting bracket.

The template allows 4mm (5/32") between adjacent units

for the suncover, increase this distance if required to
maximum of 60mm (2 3/8") between units or 180mm (3
1/8") between centres. For greater distances between
units extension cables are available.

Use a 70mm (2 3/4") diameter hole-cutter for the

mounting bracket hole.

Use a 2.9mm for the self-tapping screw holes. Use a

5mm (3/32") drill for the locking stud holes.

Secure the mounting bracket to the bulkhead with the

self-tapping screws supplied

Fit the rubber sealing gasket around the mounting

bracket.

Screw the locking studs into the back of the display head

(if required).

Carefully pass the cable tails through the mounting

bracket hole, connect the cables to the main units.

Clip the display head into the mounting bracket.

Secure the instrument with the thumb nuts supplied.


610-HB-0501-04

21